Cleanup
From The Munich Maker Lab's Wiki
This is an overview of the tasks to do at a cleanup.
Feel free to add tasks you want to be done/cleaned or adjust the interval.
| Task | Interval |
|---|---|
| --- General --- | |
| Sweep/Vacuum whole space | every cleanup |
| Sweep courtyard (with Kärcher Sweeper) | every cleanup |
| Clean table surfaces | every cleanup |
Empty trash
|
every cleanup |
Refill...
Isopropyl is in the "Giftschrank" |
every cleanup |
| Return all loose tools and things that are lying around to there original place.
Check all tool drawers, so that they are placed according to their color codes. |
every cleanup |
| --- Kitchen --- | |
| Empty dishwasher (if full let it run) | every cleanup |
| Sort out fridge | every cleanup |
| Clean kitchen surfaces | every cleanup |
| --- Lasercube --- | |
| Empty laser waste (into trash) | every cleanup |
| Empty filament waste (plastic waste) and poop tray of the BambuLab printers | every cleanup |
| Sort out free 2 take small laser material (beneath the laser) | every cleanup |
| --- Community --- | |
| Sort out project pallet (everything that is due to there label after two weeks) | every cleanup |
| Sort out "lost and found" (box in the community area - trash goes into trash other stuff into last chance) | every cleanup |
| Throw away "last chance" (box in the community area - goes into trash) | every cleanup |
| Sort out free 2 take big laser material (at entrance door - not usable stuff goes into fire pit storage or trash) | every 2nd cleanup |
| Sort out member laser material which is overdue (moved to free2take laser material) | every 3rd cleanup |
| --- Workshop --- | |
| Re-fill missing things (e.g. missing drill bits, screws, sanding paper, saw blades etc. with new ones from the storage) | every cleanup |
| Sort out free 2 take wood (workshop; old stuff goes into trash or fire pit storage) | every 2nd cleanup |
| Maintainance of the machines: e.g. cleanup the saws also inside; leave out the water of the compressor | every cleanup |
| Empty the wood vacuum and cnc vacuum | every cleanup |
| --- Other --- | |
| Check drawers with electronic parts in the electronic corner and improve sorting and labeling | If people are motivated |
| Check drawers with screws in the workshop and improve sorting and labeling | If people are motivated |
| Checkout open projects: "Someone should" Projects and grab one | If people are motivated |
| --- Finally --- | |
| Dispose plastic waste at Werstoffinsel at Leonrodplatz 5 | every cleanup |
| Check, if any important consumables are running out and should be reordered
re-supplies for the kitchen: waste bags, toilet paper; resupplies for the workshop: screws, saw blades etc. |
every cleanup |
