There will be a LAN cable from the distribution point to the new space
Nothing new besides that
Electricity Nico
Demand has been collected from all leads.
We will not fulfil that to a 100% because it's just overkill.
2 x CEE red
~8 x Normal power sockets
1 x CEE blue for our outdoor socket
RecyclingCenter David
No news
Storage Paul
No news
Gaming&Relax AdrianM
Fusion 360 document has been created - Still some discussion needed - https://a360.co/2NLdjmU
Electronics Paul and German
Still work in progress - Laser and 3D-printing room need to be finalised first to know the actual size.
Workshop Bernhard
Bernhard wasn't there.
Nico invested some brainpower and found three possible ways for the walls:
Possible to walk on ~1300€ without insulation
First half where the gate is is not walkable, the rest is ~850€ without insulation
Completely not walkable ~500 without insulation
We decided that getting up there is a hassle, what if something happens, ... so we want the cheapest solution with insulation. That way we can also recycle our current walls.
Lasercutter Bernhard
Bernhard wasn't there.
Nico made a plan how to build the room so you can get up there and store laser or 3D-Print material ~600€
3D-Printing AdrianM
Basic plan is done, see Fusion document. Details will follow.
Kitchen PeterM + Theresa
Will be planned the next week
Community Annika
Seems like we need new desks as Annika suggested to have 4-5 with the same dimensions - She will have a look how much that'll cost.
There are two options regardint the Pit:
1. We will remove the steel frame and have the whole floor on the same level
- You can't stand in the Pit
- The floor won't be perfectly even
+ No steps in the community area
+ It's easy to use the pit with a car
+ Cheap
2. Very big platform that will span from the wall to the workshop, from the Laser-Cube to the front of the Pit (close to the gate)
+ It's easier to use the pit as a storage area as you can nearly stand but it's still a bit to small to full stand
+ We don't need to remove the steel frame
+ Floor can be made flat
- There will be several steps when crossing the space
- Accessing the workshop might mean you have to take a step
- You can't bring palettes in/out of the workshop into the rest of the space
- A lot of work and money needed
Annike is sending Nico the size of the planned platform so he can do some calculations on the wood that's needed
Rest will be planned once electronic corner and kitchen have be planned
Door David
No news
Worklog since last meeting
Lights and aluminium rails in the pit have been removed
The concrete around the left metal grid in the floor was completely ruined - has been fixed with new concrete
New 50W LED floodlight has been installed in the front of the gates
Two of the floodlights in the parking lot are now controlled by a twilight switch
All holes in the walls have been filled with plaster and sanded down
Unneeded air duct in the pit has been removed
Pit has been cleaned a little
Open Decisions
Do we want the brick wall with plaster (verputzt) or as is and just painted white?
If we want it with plaster let's ask the company who built the wall if they can leave the construction scaffolding another week
If we can keep the scaffolding we will do the plastering
We have an offer from a graffiti artist who only wants money for the spray cans - do we want something?
Jan wanted to show some examples in the Plenum and we would like to know how much that might cost us. But idea is nice!
ToDos
Clarify if we can remove the concrete block in front of the pit and the door - David
David will discuss this with MGH next week
Clarify if we can remove the steel edge on the pit - David
David will discuss this with MGH next week
Plan on what to do with the ramp in the back of the space
We will mostly will it with gravel, place a sturdy foil on top and pour concrete on top
Nico will look at how much gravel, concrete and reinforcement (Armierung) we need
Nico found a foil in the space we can use
Nico will look into ways of transporting that much stuff (like renting a trailer)
Nico has the basic tools we need
Fix all holes and damaged places in the inside walls (outside would be an addition achievement!)
Will be done when we do the plastering of the brick wall
Isolate all holes to the outside, like around the gates, with PU-Foam without damaging the gates (We bought PU-Foam and it's in the new space)
Do something with the brick wall
Depends on the scaffolding
Replace metal grids with something closed
Best shot seems to be two layers of OSB 22mm + 18mm to get 40mm - There are 40mm sheets but 22 and 18 are readily available and cheap
Paint the inside walls up to the cable canal once they have been prepared