20191110 Space move 2019

From The Munich Maker Lab's Wiki
Jump to navigation Jump to search

Whats new?

  • Network & Internet Severin
    • There will be a LAN cable from the distribution point to the new space
    • Nothing new besides that
  • Electricity Nico
    • Demand has been collected from all leads.
    • We will not fulfil that to a 100% because it's just overkill.
    • 2 x CEE red
    • ~8 x Normal power sockets
    • 1 x CEE blue for our outdoor socket
  • RecyclingCenter David
    • No news
  • Storage Paul
    • No news
  • Gaming&Relax AdrianM
  • Electronics Paul and German
    • Still work in progress - Laser and 3D-printing room need to be finalised first to know the actual size.
  • Workshop Bernhard
    • Bernhard wasn't there.
    • Nico invested some brainpower and found three possible ways for the walls:
    • Possible to walk on ~1300€ without insulation
    • First half where the gate is is not walkable, the rest is ~850€ without insulation
    • Completely not walkable ~500 without insulation
    • We decided that getting up there is a hassle, what if something happens, ... so we want the cheapest solution with insulation. That way we can also recycle our current walls.
  • Lasercutter Bernhard
    • Bernhard wasn't there.
    • Nico made a plan how to build the room so you can get up there and store laser or 3D-Print material ~600€
  • 3D-Printing AdrianM
    • Basic plan is done, see Fusion document. Details will follow.
  • Kitchen PeterM + Theresa
    • Will be planned the next week
  • Community Annika
    • Seems like we need new desks as Annika suggested to have 4-5 with the same dimensions - She will have a look how much that'll cost.
    • There are two options regardint the Pit:
    • 1. We will remove the steel frame and have the whole floor on the same level
    • - You can't stand in the Pit
    • - The floor won't be perfectly even
    • + No steps in the community area
    • + It's easy to use the pit with a car
    • + Cheap
    • 2. Very big platform that will span from the wall to the workshop, from the Laser-Cube to the front of the Pit (close to the gate)
    • + It's easier to use the pit as a storage area as you can nearly stand but it's still a bit to small to full stand
    • + We don't need to remove the steel frame
    • + Floor can be made flat
    • - There will be several steps when crossing the space
    • - Accessing the workshop might mean you have to take a step
    • - You can't bring palettes in/out of the workshop into the rest of the space
    • - A lot of work and money needed
    • Annike is sending Nico the size of the planned platform so he can do some calculations on the wood that's needed
    • Rest will be planned once electronic corner and kitchen have be planned
  • Door David
    • No news

Worklog since last meeting

  • Lights and aluminium rails in the pit have been removed
  • The concrete around the left metal grid in the floor was completely ruined - has been fixed with new concrete
  • New 50W LED floodlight has been installed in the front of the gates
  • Two of the floodlights in the parking lot are now controlled by a twilight switch
  • All holes in the walls have been filled with plaster and sanded down
  • Unneeded air duct in the pit has been removed
  • Pit has been cleaned a little

Open Decisions

  • Do we want the brick wall with plaster (verputzt) or as is and just painted white?
    • If we want it with plaster let's ask the company who built the wall if they can leave the construction scaffolding another week
    • If we can keep the scaffolding we will do the plastering
  • We have an offer from a graffiti artist who only wants money for the spray cans - do we want something?
    • Jan wanted to show some examples in the Plenum and we would like to know how much that might cost us. But idea is nice!

ToDos

  • Clarify if we can remove the concrete block in front of the pit and the door - David
    • David will discuss this with MGH next week
  • Clarify if we can remove the steel edge on the pit - David
    • David will discuss this with MGH next week
  • Plan on what to do with the ramp in the back of the space
    • We will mostly will it with gravel, place a sturdy foil on top and pour concrete on top
    • Nico will look at how much gravel, concrete and reinforcement (Armierung) we need
    • Nico found a foil in the space we can use
    • Nico will look into ways of transporting that much stuff (like renting a trailer)
    • Nico has the basic tools we need
  • Fix all holes and damaged places in the inside walls (outside would be an addition achievement!)
    • Will be done when we do the plastering of the brick wall
  • Isolate all holes to the outside, like around the gates, with PU-Foam without damaging the gates (We bought PU-Foam and it's in the new space)
  • Do something with the brick wall
    • Depends on the scaffolding
  • Replace metal grids with something closed
    • Best shot seems to be two layers of OSB 22mm + 18mm to get 40mm - There are 40mm sheets but 22 and 18 are readily available and cheap
  • Paint the inside walls up to the cable canal once they have been prepared
  • Install power cables and connect them (two tasks)
  • Install Network cabling