Archive:Exodus: Difference between revisions

From The Munich Maker Lab's Wiki
Jump to navigation Jump to search
m (Vrs moved page Exodus to Archive:Exodus)
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{outdated}}
{{project
{{project
|name        = Exodus
|name        = Exodus
Line 23: Line 25:
== Requirements For Room Planning ==
== Requirements For Room Planning ==
*Storage place for 30 boxes drinks + 6 empty boxes for empty bottles
*Storage place for 30 boxes drinks + 6 empty boxes for empty bottles
* Dirty Room Wall for the Plate for CNC , wall with 2,6m ( around 1,6m high ) 30cm deep for the future big mill ( will be for folding down so place in front should be empty to be used if needed)
* Dirty Room Wall for the Plate for CNC , wall with 2,6m ( around 1,6m high ) 30cm deep for the future big mill ( will be for folding down so place in front should be empty to be used if needed),maybe seperate the Drilling Maschie to get more 2 spaces for manual working ( or one much bigger one) wall for toolswall , option for bandsaw ( 1x1m )
  maybe seperate the Drilling Maschie to get more 2 spaces for manual working ( or one much bigger one) wall for toolswall , option for bandsaw ( 1x1m )


== Possible locations ==
== Possible locations ==

Latest revision as of 15:17, 10 September 2022

Attention.png You are visiting an old wiki page. The information found on "Exodus" might be out of date.
 
Exodus

Release status: experimental [box doku]

Exodus.jpg
Description we need new rooms and fast!

We have to leave the Siemenswerke by February so let's for a bigger, better, and more awesome space!!!

Requirements

  • >100m² only for us or >140m² with the HuS
  • Current rent is ~ 12€/m² (warm). New rent shouldn't be higher, we also need to pay for electricity probably, which we don't do now.
  • accessible for every member 24/7
  • Easily reachable via public transportation

Requirements For Room Planning

  • Storage place for 30 boxes drinks + 6 empty boxes for empty bottles
  • Dirty Room Wall for the Plate for CNC , wall with 2,6m ( around 1,6m high ) 30cm deep for the future big mill ( will be for folding down so place in front should be empty to be used if needed),maybe seperate the Drilling Maschie to get more 2 spaces for manual working ( or one much bigger one) wall for toolswall , option for bandsaw ( 1x1m )

Possible locations

Pasing

Due to the Pasing Arcaden, a lot of shops had to leave the area. It's a bit far of, but there are lots of S-Bahn, Buses and a Tram going there, so it's about as easy to reach than the Siemenswerke.

Properties

Kunstpark Ost

Back to the roots! The Werkbox³ is still there, and Werk 3 has opened.

Properties

Westend

Cool part of the city, some office space there. Not sure if it's not to expensive by now

Properties

Sendling

Kulturzentrum GOROD

The Kulturzentrum GOROD near Harras has a 130m² room for classes, as well as quite a large basement. They are thinking about renting out the class room, but the basement would be much cheaper (~5€/m² cold). There is a section that should be about 120m², with quite high ceilings, that would be ideal. Severin went there on Dec 3rd, and got a look at it. There are two freight elevators down into the basement, one of which has a proper truck dock. It's a bit cold down there, so heating costs might be a bit higher, and there's no daylight -> no windows. The people from the Kulturzentrum would be interested in a cooperation with us, since they also have quite a few youth groups from Ukraine and Russia visiting them.

Things to discuss with them still:

  • Access during odd hours
  • Exact size of the section, + possible expansions
  • Available power
  • Ventilation
  • Water?
  • Heating
  • How fast we could move in
  • Space for HuS?

Kreativquartier

Martin was in discussion with people there. Not sure what the current status of that is. There could be a very cool option!!! I'll show you everything on sunday! --Martin

Misc

everywhere else

Properties

PR

We haven't publicly announced (e.g. on social media) that we're searching for new rooms. The idea was to start a fundraising campaign alongside our search, to make the financial burden of moving a little easier on us. Any help on setting this up is very much appreciated.