Plenum

From The Munich Maker Lab's Wiki
Revision as of 17:39, 23 February 2017 by Tiefpunkt (talk | contribs)
Jump to navigation Jump to search

The Plenum is a soon-to-be regular meeting of all people involved with the space to talk about things, and decide stuff.

If you have stuff to add, go right ahead! Please sign your points with your name (by adding a "--~~~~" after your text).

Next Plenum: February 23nd, 8:00pm


Topics for the next Plenum

What are you currently working on?
Tell everyone about your current projects.
Thank you
Let's say thank you to those who did some awesome stuff for the space since the last plenum
  • Heiko for getting wall shaped stuff to the space
  • Adrian, David and Nico for building the wall
  • Adrian and Tobias for putting up the cable trays
  • Neo eventservice for borrowing Ladder
Stuff from the past
What was discussed at the last Plenum? What's the current status on those things?
20170216 Plenum
Anything you don't feel comfortable with in the space? What would you like to change or to be changed?
Is there anything that's bothering you?


Use of the Workshop
Reminder: Like discussed during our planning meetings the workshop is one of the rooms that is being rented in the beginning.
We will try to open it up to the public as soon as possible though. Here is a rough plan:
  • We will store our big tools in the shop (CNC, drillpress, lathe, ...)
  • Workshop will be locked for 2-3 Month
  • Access will be given to certain people during that time (tbd)
  • Private stuff in the workshop will be made "safe for public" and once that's done the doors will be opened
  • It will be evaluated how fast the MunichMakerLAB is able to take over the workshop and if we implement other concepts like "werkboxes"
--Nicolai
Space Audio
  • Needed Rackspace for Amping and Transmitting: 4HE in the Front and Back. Things in the Rack: Amping for the Loudspeakers, IO Stuff
  • Placement of the Mixingconsole. The unit can physically fit into 12 HE, however 14HE would be necessary to accommodate the cabling connected to the back of the unit.
  • Costs for mounting Speakers: About 20€ for the Bracket. If we want to get fancy: +40€ for 2x 0.5m Steelflex
--Rene (talk) 20:47, 20 February 2017 (CET)
Laser material shelf
  • Jörg, Nico and Peter planned a shelf for the material for the cutter
  • Will be based on a euro palette and will cost 250€ max.
Todos in Trello
Trello Todos New Space
Let's check the achievements and Todos in Trello: What have we done, what is pending, needs planning, responsible person...
Stuff to buy
Drinks
We need someone to be there Friday to receive our drink delivery.
Nico will give the someone 200€