Plenum: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 31: | Line 31: | ||
:* Private stuff in the workshop will be made "safe for public" and once that's done the doors will be opened | :* Private stuff in the workshop will be made "safe for public" and once that's done the doors will be opened | ||
:* It will be evaluated how fast the MunichMakerLAB is able to take over the workshop and if we implement other concepts like "werkboxes" | :* It will be evaluated how fast the MunichMakerLAB is able to take over the workshop and if we implement other concepts like "werkboxes" | ||
;Space Audio --[[User:Rene|Rene]] ([[User talk:Rene|talk]]) 20:47, 20 February 2017 (CET)Rene | |||
:* Needed Rackspace for Amping and Transmitting: 4HE in the Front and Back. Things in the Rack: Amping for the Loudspeakers, IO Stuff | |||
:* Placement of the Mixingconsole. The unit can physically fit into 12 HE, however 14HE would be necessary to accommodate the cabling connected to the back of the unit. | |||
; Todos in Trello | ; Todos in Trello |
Revision as of 20:48, 20 February 2017
The Plenum is a soon-to-be regular meeting of all people involved with the space to talk about things, and decide stuff.
If you have stuff to add, go right ahead! Please sign your points with your name (by adding a "--~~~~" after your text).
Next Plenum: February 23nd, 8:00pm
Topics for the next Plenum
- What are you currently working on?
- Tell everyone about your current projects.
- Thank you
- Let's say thank you to those who did some awesome stuff for the space since the last plenum
- Adrian and Nico for building the wall
- Adrian and Tobias for putting up the cable trays
- Stuff from the past
- What was discussed at the last Plenum? What's the current status on those things?
- 20170216 Plenum
- Anything you don't feel comfortable with in the space? What would you like to change or to be changed?
- Is there anything that's bothering you?
- Use of the Workshop
- Reminder: Like discussed during our planning meetings the workshop is one of the rooms that is being rented in the beginning.
- We will try to open it up to the public as soon as possible though. Here is a rough plan:
- We will store our big tools in the shop (CNC, drillpress, lathe, ...)
- Workshop will be locked for 2-3 Month
- Access will be given to certain people during that time (tbd)
- Private stuff in the workshop will be made "safe for public" and once that's done the doors will be opened
- It will be evaluated how fast the MunichMakerLAB is able to take over the workshop and if we implement other concepts like "werkboxes"
- Space Audio --Rene (talk) 20
- 47, 20 February 2017 (CET)Rene
- Needed Rackspace for Amping and Transmitting: 4HE in the Front and Back. Things in the Rack: Amping for the Loudspeakers, IO Stuff
- Placement of the Mixingconsole. The unit can physically fit into 12 HE, however 14HE would be necessary to accommodate the cabling connected to the back of the unit.
- Todos in Trello
- Trello Todos New Space
- Let's check the achievements and Todos in Trello: What have we done, what is pending, needs planning, responsible person...
- Stuff to buy
-
- Ladder