20191201 Space move 2019: Difference between revisions
Jump to navigation
Jump to search
(added category) |
No edit summary |
||
Line 53: | Line 53: | ||
* We'll paint all concrete floor but maybe with better and more robust paint than what we had last time | * We'll paint all concrete floor but maybe with better and more robust paint than what we had last time | ||
* It rained on the Saturday and it rained inside the new space (In front of the gate with the door) | * It rained on the Saturday and it rained inside the new space (In front of the gate with the door) | ||
[[Category: | [[Category:Space move 2019]] |
Latest revision as of 19:02, 23 December 2019
Whats new?
- Network & Internet Severin
- Network outlets need to be planned and installed
- Severin, AdrianM and German know how to administer the new network infrastructure
- Basic stuff should not be touched and for everything else access switches will be installed
- Both spaces now have Network and Wifi
- Electricity Nico
- Plan is ready
- Most of the cables have been installed
- When everything is done Andreas will connect the cables
- RecyclingCenter David
- Storage Paul
- Gaming&Relax AdrianM
- Electronics Paul and German
- Workshop Bernhard
- Wood for the roof is needed
- As soon as the shop is ready we will move the most crucial tools to build out the new space
- Lasercutter Bernhard
- David wanted to shorten the filter box - didn't yet happen
- Material for the air venting isn't known yet
- 3D-Printing AdrianM
- Kitchen PeterM + Theresa
- A new kitchen appeared which needs some fixing though
- Floor has been painted
- Dirt sink has been moved
- Layout is changing a bit but it'll be good
- Community Annika
- There are tables which we can most likely have. They look good! But they are a bit bigger than we wanted. Can work though.
- We planned to install two multi sockets in the floor (cable will be routed through the kitchen)
- Nico forgot to bring his projection area
- Other spaces will be planned when we moved Electronics and the kitchen
- Door David
Worklog since last meeting
- Internet Modem is now next to the stairs to the toilet
- There now is a network rack with Internet and WiFi in the new space
- Workshop walls have been built (roof is still missing due to lack of material)
- Most electrical wires have been routed to their final location
- gap between the floor and the new concrete area at the ramp has been filled with self levelling concrete
- Floor in the new kitchen has been painted - rest to come
ToDo by end of next week
- Paint the floor
- Clarify if we can remove the steel edge on the pit
- Install power cables and connect them (two tasks)
- Install Network cabling
- Build laser room
- Put a roof on the workshop
- Paint the brick wall
Other stuff
- Trello
- We'll paint all concrete floor but maybe with better and more robust paint than what we had last time
- It rained on the Saturday and it rained inside the new space (In front of the gate with the door)