Stuff on a mission: Difference between revisions

From The Munich Maker Lab's Wiki
Jump to navigation Jump to search
(4 intermediate revisions by the same user not shown)
Line 27: Line 27:
| 2023-03-08 || 2023-03-10 || Aaron || private || workzone video endoscope
| 2023-03-08 || 2023-03-10 || Aaron || private || workzone video endoscope
|-
|-
 
| 2023-03-17 || 2023-03-22 || Simran || private || Hot Air Gun
| 2023-03-10 || 2023-03-11 || Simran || private || Sanding Machine
|-
|-
 
| 2023-03-22 || 2023-03-22 || Simran || private || Guide Rail
| 2023-03-10 || 2023-03-11 || Simran || private || Big Leveller
|-
| 2023-03-22 || 2023-03-22 || Simran || private || Plunge Circular Saw
|-
|-


|}
|}

Revision as of 18:25, 21 March 2023

We have a lot of stuff at the space, that is also very useful elsewhere at times. To not loose track of stuff, we keep a list of what is needed when. This also helps to resolve conflicts where the same things are needed in two places at once. So please put in a reservation in advance.

Reservations

Date(s) Name Event Stuff Comment

Currently away on a mission

Date of Departure Estimated date of return Name Event Stuff
2023-03-08 2023-03-10 Aaron private workzone video endoscope
2023-03-17 2023-03-22 Simran private Hot Air Gun
2023-03-22 2023-03-22 Simran private Guide Rail
2023-03-22 2023-03-22 Simran private Plunge Circular Saw