20191124 Space move 2019
Jump to navigation
Jump to search
Whats new?
- Network & Internet Severin
- Network cable is being routed for our internet connection - The router still needs a power socket though
- One wall mounted network rack is being bought
- Small server rack is being placed in the pit
- Internet should be there within the next week
- Both spaces have a network cable so we don't need a hard cut
- Electricity Nico
- Except for the CEE stuff all material is there and the plan for the outlets will be uploaded tomorrow
- Seems like we only have 3 x 4sqmm cables in the new space - can't be more than 3 x 35AH
- RecyclingCenter David
- Nothing new - still need an assigned space
- Storage Paul
- Everything is well prepared except for the location of the bis storage boxes - there are still too many unknowns to plan that
- We need to tell storage box owners to make the boxes transport ready (secure doors + contents, disconnect cables)
- Tell all members to make sure that their boxes are stackable and not overflowing
- Put member boxes onto EPALs
- Gaming&Relax AdrianM
- Pinball has moved in the floorplan rest should be fine for the moment
- Electronics Paul and German
- Not enough space in the floorplan - needs about one more meter which cuts into the space of the Laser-Room
- Seems like the measurement in Fusion is wrong
- Adrian will provide a size for the laser room to Nico
- Workshop Bernhard
- Rough layout is ready but he needs more measurements
- Will plan the room - ETA Tuesday
- Lasercutter Bernhard
- Plotter will be placed in the room as well
- There will be a foldable table
- Pit air removal will be installed by Rene
- 3D-Printing AdrianM
- Automatic shutdown of the printers is being planned
- Kitchen PeterM + Theresa
- Current kitchen is being placed against the wall
- A second cooking place is planned but we're not sure if we can deliver enough power
- Community Annika
- Still not clear what happens with the steel edge
- Power not clear
- We don't yet know which tables we need
- Space between kitchen and electronics corner is not clear
- Projector will project against a white wall next to the entrance
- Plan with the projector doesn't work with the current storage layout
- Door David
Worklog since last meeting
- Shelf near door has been disassembled
- Old electricity installation from the wood wall has been removed
- Wood has been sorted and the less useful pieces have been prepared for disposal
- One wall in the new space has been fully painted
- 3D-Printer corner has been disassembled, two printers temporarily set-up in the gaming corner and everything else stored on a pallet
- First round of sorting the free2use area has been done
- Two storage containers near soldering corner have been sorted and cleaned out
- Walls have been painted
- Old workshop walls have been disassembled
- Prepared internet from toilet hallway to new hall - half way done
ToDo by end of next week
- Build the laser room (if we get the wood)
- Build the workshop room
- Fix the floor with self leveling concrete where needed
- Paint the floor between the ramp and the kitchen
- Clarify if we can remove the steel edge on the pit
- Install power cables and connect them (two tasks)
- Install Network cabling