Archive:New Space: Difference between revisions
Jump to navigation
Jump to search
Line 22: | Line 22: | ||
** 19inch Rack?? | ** 19inch Rack?? | ||
** Internet Uplink? - School IT? | ** Internet Uplink? - School IT? | ||
** WLAN - Freifunk + members only | |||
* Electricity | * Electricity |
Revision as of 22:09, 11 December 2014
We're moving soon. There's lots of stuff to do.
ToDo List
- Planning the wall
- Doors
- Power outlets?
- Light switches?
- Computer controllable -> DMX?
- Entrance control -> Doorlock
- two doors with paniclocks (panikschloss)
- central door with electronic opener
- Keymatic: cheap and cheerful
- Motorschloss (see http://wiki.muc.ccc.de/luftschleuse2)
- Light control -> LightsOut
- DMX Switchpack 12 Kanal (ebay ~80€)
- Network
- 24Port switch here
- patchpanel here
- 19inch Rack??
- Internet Uplink? - School IT?
- WLAN - Freifunk + members only
- Electricity
- in the raise floor
- in the dry wall
- over the ceiling
- Air exhaust
- Blower from Lasercutter is here
- Some filtering from the lasercutter need to be done
- Building the wall
- Streichen oder Glasfasertapete??? (maybe Tasso or somebody has some lying around??)
- Removing AC units and pipes
- Water???
- Kitchen
Stuff to buy
- Power outlets (double with drywall mount): 6x - Andi is getting them
- Light switches
- Power cable
- DMX Controller
- Door locks