Archive:New Space: Difference between revisions
Jump to navigation
Jump to search
m (→ToDo List) |
m (Aaron moved page New Space to Archive:New Space) |
(No difference)
|
Latest revision as of 13:52, 10 September 2022
We're moving soon. There's lots of stuff to do.
Timeline
1.)
- Plan entrance, switches and light
- Get stuff for wall (HuS)
- Internet!
2.) (maybe first weekend January)
- Build Wall
- 3x2 duple power outlets in wall
- Light switches on every door
- mounting point on the outside on the middle door for card reader, etc.
- cables through floor
- Paint/Tapezier wall (2 buckets of white paint available, ask Jan)
- temporary locking system for door
(moving stuff from the mumalab is now possible
3.)
- build locking system
- Route lighting power inside room (outside at the moment)
- Build dmx system for light
- Electric stuff
4.)
- Plan Abluft system
- start to get more furniture
- Kitchen
ToDo List
- Planning the wall
- Doors
- Power outlets?
- Light switches?
- Computer controllable -> DMX?
- Entrance control -> Doorlock
- two doors with paniclocks (panikschloss)
- central door with electronic opener
- Keymatic: cheap and cheerful
- Motorschloss (see http://wiki.muc.ccc.de/luftschleuse2)
- Light control -> LightsOut
- Network
- 24Port switch here
- patchpanel here
- 19inch Rack??
- Internet Uplink? - School IT?
- WLAN - Freifunk + members only
- Electricity
- in the raise floor
- in the dry wall
- over the ceiling
- Air exhaust
- Blower from Lasercutter is here
- Some filtering from the lasercutter need to be done
- Building the wall
- Streichen oder Glasfasertapete??? (maybe Tasso or somebody has some lying around??)
- Removing AC units and pipes
- Water???
- Kitchen
Stuff to buy
- Power outlets (double with drywall mount): 6x - Andi is getting them
- Light switches
- Power cable
- DMX Controller
- Door locks